Geological Survey of management is 2.2 + 6.8 + soil test inspection budget

September 11, 2008 Geological Survey of management is 2.2 + 6.8 + soil test inspection budget 2006-8-2 15:04:00 arguments are engineering geological investigation is soil test + + management management software budgets are survey Almost 3 in 1 ————————————————– —————————— 1, the basic module Help with the basic content of survey work, including 12 major functions: (1) Data Entry: To the core drilling and laboratory raw data input field. Automatic statistical parameters of the comprehensive geological stratification; be transferred to the original engineering survey data for reference; worksEngineering data management to complete a number of "split together"; GIS data formats are fully compatible with reason. (2) data import, export: Provide a variety of ways of data conversion tools and data interfaces. (3) Plan: According to a specified percentage of the original input parameters, automatically generating exploration point (drilling) plane location map. (4) profile: Automatic or manual division of soil, geological profile control automatically (off) surface map, including drilling data, dynamic and static penetration curve, design elevation, indicate so on the basis of elevation; convenientEditing features to handle complex situations; modify the results back to write the database. (5) histogram: Auto Health drilling histogram, includes core to rate, RQD, shear wave velocity. (6) laboratory test results table: Automatically generated summary of soil test results, physical and mechanical index comprehensive tables, standard penetration test results table, dynamic penetration (light, heavy, super heavy) test results table, liquefied calculation results table, the design parameters of physical and mechanical index table, exploration point list. Customizable forms and form template file format.

Tags:



Soil test to work in IT technology and

August 5, 2010 Abstract: This article analyzes civil engineering IT technology and collaborative work mode and other methods, described how the above method is applied to laboratory soil test, so as to achieve an accurate grasp of all aspects of testing, improve the test efficiency and accuracy. Keyword: Indoor test, IT technology, the construction process simulation system, virtual reality systems to work together Introduction: The indoor test on the current terms, whether it is true triaxial tests or triaxial test, the implementation of the method is toHave been fixed according to processes and data handling operations, by a long time testing, observation and integration, which was unearthed in the mechanical properties of the various body methods. Although this test method now studying the soil physical properties of the best methods, and has a fixed pattern, but operation of the experimenter Wufazhangwo Tu occurring of the various deformation not possible to accurately grasp the generated reason of error and operation complicated and slow, data collection influenced by human factors. This is a natural requirement is necessary for us to find another way to assist the conduct soil test. Today, IT technology has been promoting the use of various fields in civil engineering, itTo use computer simulation project for various construction processes and Zai changes occurred in these processes, the reality of the construction process to Shi's a very good comparison and reference; 协同 work is also to be in a certain network environment in, Tong Guo certain collaborative mechanism to quickly and orderly completion of the work. So it can be civil in IT technology and applications to work together in the indoor test go? Through analysis we can find, we can use IT technology to model the soil samples 在 testing process Gezhong deformation, and the manual test operations and IT simulation work Xianghu collaboration, information sharing, so the experimental results obtained willMore credible and effective. Therefore, the IT technology in indoor test and to work together to complete, is an effective test method. Body: Soil test of the operation process is relatively fixed, want to work with IT technology and integrate them, we need to fully understand the civil engineering IT technologies and how to work carried out. First of all, IT technology in civil engineering construction has two systems: the construction process simulation systems and virtual reality system. Construction process simulation system which can in AutoCAD, 3D modeling of engineering facilities, and then use the appropriate graphicalTaiwan, a dynamic view, to understand the entire construction process; virtual reality system will be the construction of the concrete operation by computer simulation, you can simulate the facilities and facilities for true comparison. Secondly, teamwork is a highly effective mode of cooperation It effectively Liyongwangluo Ping Tai, its superiority is Nenggoushike Jin Xing Ge professional time to time the division of labor between sectors information sharing and 转换 through certain Xietong mechanism, rapid and accurate completion. The indoor test site usually through the soil in preparation of soil samples, soil saturation after several process to install the equipment on trial, however

Tags:

Pages: 1 2 3 4 5 6 7 8 9 10 ...25703 25704 25705 Next